Step 11: Insulation
September 2018
The last step before getting actual walls... insulation, to keep in all that lovely heat and air we'll be getting from our brand new HVAC units!!
MUDROOM/KITCHEN
left: mudroom
right: kitchen
right: kitchen
KITCHEN
kitchen: window looking out to the lake
far right: dining room
DINING/LIVING ROOM
Yes, still with the old bathtub in the middle of the floor. One day, they say they'll take it out. We'll see
KITCHEN/MUDROOM
foreground: kitchen (where fridge will be)
background: mudroom (where bench will be)
left: outside of master bath
MASTER BEDROOM
OFFICE
Yes, that dang couch is still there too... they assure me they will eventually dispose of it.
UPSTAIRS
GIRL'S BEDROOM
BOYS' BEDROOM
UPSTAIRS MASTER
background: stairs to the attic
attic stairs
(really more of a ramp)
see how they caulked all of the cracks? nicely done, fellas!
This is the exterior where there used to be a door, but we made it a window. You can see the insulation not just poking through, but like just being there. But don't worry, they assure me they will take care of that before they put up the siding.
Hey, look, insulation even goes around plumbing!
KITCHEN
(view straight on from dining room)
DOWNSTAIRS MASTER BATH/CLOSET
downstairs master bath/closet view from the master bedroom
door on left: master closet
middle door: linen closet
door on right: master bath
OFFICE
view from master bedroom, looking through the wall
All ready for drywall, guys!!
NEXT: Step 12: Drywall
Comments
Post a Comment